Lean Games provide complete ready to use lean simulations and kits for use in training of lean manufacturing and continuous improvement techniques.

View My Basket

(0 items)

Plug Factory Simulation

Plug Factory GamePlug factory simulation - this lean simulation is based on assembling 3 pin plugs,it is a ideal simulation to demonstrate the following concepts:

- Layout
- Push/pull
- One piece flow
- Kanban
- Work balance
- Benefits of training

Our lean simulations are complete, ready to run games containing:
- Instruction booklet and CD with PowerPoint standard operating procedures and Excel measurement table
- Standard operating procedures with colour photos
- Objectives

Number of participants:
- Each lean simulation can be run with 6 to 12 people
- Additional people can be observers

Running the lean simulation
- This is normally run over 4 rounds of 10 minutes with discussion on learning and improvements made between each round The whole game normally takes 2 -3 hours to complete Each lean simulation can be used many times over

The price of this game is £325 (exc. VAT) - Order Form / Buy Online
View video

Torch Factory Simulation

Plug Factory GameTorch factory simulation - this lean simulation is based around assembling torches, with larger components it requires less dexterity than the plug game. A number of components have been modified to cause defects during assembly, therefore the simulation is ideal for reinforcing the importance of quality improvement. In addition to the concepts demonstrated by the plug game we recommend the torch game for the following:

- Quality filter mapping
- Recording data
- Understanding customer requirements
- Pareto analysis

Our lean simulations are complete, ready to run games containing:
- Instruction booklet and CD with PowerPoint standard operating procedures and Excel measurement table
- Standard operating procedures with colour photos
- Objectives

Number of participants
- Each lean simulation can be run with 6 to 12 people
- Additional people can be observers

Running the lean simulation
- This is normally run over 4 rounds of 10 minutes with discussion on learning and improvements made between each round
- The whole game normally takes 2 -3 hours to complete
- Each lean simulation can be used many times over

The price of this game is £350 (exc. VAT) - Order Form / Buy Online

Set up reduction (SMED) simulation

Application summary

SMED simulation KitThe SMED game is based on a simulated machine and can be used across a wide range of industries for example, CNC machining, packaging, food, plastics, electronics, printing, etc. The machine simulates mechanical, pneumatic, colour and software alterations and also the manufacture of a "first off" with quality inspection. The aim of the game is to demonstrate the principles of SMED and allow the trainees to practice the SMED methodology on this simulation before starting actual implementation on their own equipment.

Normally the game involves 2 volunteers who changeover the machine using the standard procedure supplied and a little guidance from the facilitator. It would be quite possible for up to 20 other people to SMED close upobserve the changeover, although normally we would expect a group of between 6 and 12 participants. All the participants then work through each of the steps of SMED, applying them to the original procedure, this is normally done in smaller sub groups of 2 or 3 people.

Each kit is supplied in its own easy to store and transport bag and contains the following:

- The simulation machine (approximate dimensions (500mm x 500mm)
- Instructions on how to run the simulation
- Required changeparts
-All necessary spanners/tools
SMED setup jig- Standard quality samples
- USB cable to simulate software download - it is assumed you would use your own laptop to demonstrate this with the trainees
- Standard operating procedure for the traditional changeover
-Suggested ideas to achieve a single minutes changeover and some additional parts to demonstrate the practice
- Stop watch to carry out the timing

The price of this game is £845 (exc. VAT) - Order Form / Buy Online
View video

 

5S game

Plug Factory GameWe would recommend the 5S game if you wish to demonstrate the benefits of improved workplace organisation and visual management.

The objectives of the 5S game are to demonstrate :

  1. The key steps of the 5S methodology
  2. The benefits of using visual management in the workplace
  3. The efficiency gains associated with an organised
    workplace
  4. The use of measurement in the improvement process.
  5. Implementing improvements through a teamwork approach

The 5S game can take anywhere between 45 minutes to 3 hours to run, allowing for discussion, depending on the depth of learning required.

The 5S game is normally run with 4 participants, but it is practical to
have up to 20 observers

The 5S game comes with full instructions and can be run time and time again.

The price of this game is £195 (exc. VAT) - Order Form / Buy Online
View video

Catapult game - Six sigma / problem solving

Six Sigma GameThe catapult game is an ideal practical training simulation to demonstrate the application of problem solving techniques such as fishbone diagrams, brainstorming and six sigma / DOE. It is used as the basis of exercises to understand the process, control variation and deliver improved performance.

The catapult is designed to "shoot" a lightweight ping pong size ball at a target which is typically placed 3 - 4 metres (10 - 14 feet) away. There are a number of settings and variables designed into the catapult which need to be understood and controlled to make each shot repeatable and accurate.

The catapult game can take between 1 hour and 8 hours to run depending on the depth of learning required.

Six Sigma GameThe game is normally run with a small team of between 4 - 6 people. For larger groups further catapults can be used.

A PDF instruction manual (184 pages) is included, which in summary covers:

  1. An introduction and overview of the catapult
  2. A range of experiments/ exercises that can be carried out
  3. Measurement systems
  4. Design of experiments
  5. Standard operating procedures and key variables to be controlled

The catapult is supplied in its own easy to store and transport bag and contains:

  1. Transport/storage bag
  2. Catapult
  3. Tape measure
  4. Set of balls
  5. PDF Instructions

The price of this game is £350 (exc. VAT) - Order Form / Buy Online
View video

 

To purchase any of these items online, simply click the 'Buy online' link relative to that item. We can accept the majority of credit/debit cards. All charges will be levied in GBP and will be converted to your currency at the prevailing conversion rate in place with your card provider at the time of purchase. If you are wishing to purchase goods from us by cheque, or bank transfer please contact us first.

To request training for any of these games, click here to contact us.

Products may differ slightly from those illustrated.
All prices shown above exclude delivery, which is charged at cost.
If you are ordering online this will be calculated for you on your basket, a table of charges is also available. If you are placing an order offline, or you are ordering multiple items then please contact us with details of your order, delivery method and destination and we will confirm the cost for you.

All prices are exclusive of VAT which is chargeable on sales to UK and EU customers.
Our VAT No. is 879 5896 28. If you are making a business purchase within Europe, but outside the UK, you may wish to contact us quoting your VAT no. first in order that we can deduct VAT at source.

Lean Games Ltd is a company registered in England and Wales, No. 5815183. Registered office: Combe Down Lodge, Combe Florey, Taunton, TA4 3JG, UK

Returns Policy | Terms & Conditions | Privacy Policy | P & P